Gallery




Foot path built for Lake District National Park Authority

 
Click on an image for an enlarged photo or click here for a downloadable pdf of this project
1
2
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 
  
 


Contact Us

Contact UsEnvironmentally Ground Stabilisation Ltd

Springfield, Burton Road, Oxenholme, Kendal, Cumbria. LA9 7ER

Tel: 01539 729999

Fax: 01539 727775

Mobile - Steven Fell: 0772 0980085

Email: steven@egs-ltd.co.uk

Advantages of The Consolid System tick

  • Reduces costs by 20%
  • Less disturbance to the environment
  • Very short curing time can in most cases be used immediately
  • No slab effect
  • Can be pre-mixed and stored until required
  • No frost heave
  • Can be used as a temporary road and when needed elsewhere can be ripped up and laid again
  • Recycled soils can be used that would otherwise be useless as construction material
  • Less wearing course needed as sub base and base create an improved bridging function of the soil layers and thus a risk free diminuation of the wearing course.